Have questions about procedure 5 asbestos abatement work plan requirements or removal procedures?
Contact us we will be happy to answer your questions.
What is an Asbestos Procedure 5?
as defined by the SCAQMD guidelines for asbestos site clean-ups
Rule 1043 procedure 5 plans
Procedure 5 Plans are required to clean-up any disturbed Asbestos Containing Materials, but not limited to:
- Removal of asbestos after a renovation or non-burning demolition activity – R1403(d)(1)(C)(ii)(III),
- Clean-up of any Associated Disturbance1 of Asbestos Containing Material – R1403(d)(1)(C)(ii)(V),
- Removal of asbestos using an alternative combination of techniques and/or engineering controls – R1403(d)(1)(D)(i)(V)(1),
- Removal of asbestos using pre-approved, specific techniques and/or engineering controls – R1403(d)(1)(D)(i)(V)(2), and
- Removal of asbestos that has suffered damage from fire, explosion, or natural disaster – R1403(d)(1)(D)(ii)(I).
Examples of asbestos abatement projects requiring Approved Alternative Procedure 5 Plans are, but not limited to:
- Removal of subterranean transite or asbestos-containing coal-tar wrapped pipe
- Clean-up of any spill or improperly removed, handled or disposed ACM, nonfriable Class II ACM or ACWM
- Clean-up of ACM and/or asbestos contaminated soil from crawlspaces from any site, and
- Clean-up of buried ACM or ACWM from landfills, waste sites, grading operations, etc.
- Request for using power tools to remove asbestos inside modified containments
- Demolition of “red tag” buildings (structurally unsound)
- Clean-up of ACM delamination, fallout or damage due to building settling, weathering, seismic events, improper maintenance practices, impacted during building operations, etc.
At WDR Contracting our asbestos removal technicians are fully certified and highly experienced in the asbestos removal procedures required for each project.
We pride ourselves in providing complete customer satisfaction.
Our highly qualified and experienced asbestos removal technicians strive to provide top quality work in all aspects of our trade.
Please feel free to call us if you have any questions about procedure 5 work plan requirements or removal procedures, we will be happy to answer your questions (626)975-1077